Norwich Northern Distributor Road project completes installation of final bridge beams

Upcoming Projects
Typography

Norfolk County Council and Balfour Beatty have successfully completed the final bridge beam lifts on the 20km Norwich Northern Distributor Road (NNDR) project, lifting 32 beams into place at Middle Road, Great Plumstead, with a 500 tonne crane in under two days.

This will be the second ‘green bridge’ on the route, with the hedgerow and panelling designed to create a dark corridor that will provide a safe crossing for bats on a known flight path.Ian Taylor, Project Manager for Norfolk County Council, said: “Since the beginning of the year we’ve seen main beam lifts completed on all eight bridges – including the sizable steel beams over the Norwich to Sheringham railway. All have gone without a hitch, which is a credit to the professionalism of Balfour Beatty. Completing the bridge beam lifts is a significant advance for the project.”

Chris Sedman, Balfour Beatty Norwich Northern Distributor Road Project Director, commented: “The installation of the final bridge beams on the Norwich Northern Distributor Road is a great success for the project and a testament to the team’s engineering capabilities. Over the coming months, we look forward to opening a number of bridges which will enable the local community to experience some of the many benefits the project will deliver including improved road access and reduced congestion.”

Media enquiries to:
Cassie Farrar
Balfour Beatty
t: +44 (0) 207 963 2150
e: This email address is being protected from spambots. You need JavaScript enabled to view it.

Balfour Beatty is a leading international infrastructure group. With 30,000 employees, we provide innovative and efficient infrastructure that underpins our daily lives, supports communities and enables economic growth. We finance, develop, build and maintain complex infrastructure such as transportation, power and utility systems, social and commercial buildings.Our main geographies are the UK, US and Far East. Over the last 100 years we have created iconic buildings and infrastructure all over the world including the London Olympics’ Aquatic Centre, Hong Kong’s first Zero Carbon building, the National Museum of the Marine Corps in the US and the Channel Tunnel Rail Link.

Market Movers

Market Vectors Chinese Renminbi

PCX : CNY - 20 Sep, 10:16am
44.82
-0.50 (-1.10%) After Hours:
Open 44.82 Mktcap
High 44.82 52wk Hight 46.90
Low 44.82 52wk Low 38.05
Vol 264 Avg Vol 1552
Eps nan P/e
Currency: USD

Starwood Hotels & Resorts World

NYQ : HOT - 22 Sep, 4:00pm
77.05
-0.20 (-0.26%) After Hours:
Open 77.59 Mktcap
High 77.75 52wk Hight 84.34
Low 76.82 52wk Low 69.40
Vol 18.60M Avg Vol
Eps 2.92 P/e
Currency: USD

Seabridge Gold, Inc. Ordinary S

NYQ : SA - 20 Sep, 10:21am
11.775
+0.175 (+1.509%) After Hours:
Open 11.600 Mktcap 676.09M
High 11.800 52wk Hight 12.850
Low 11.600 52wk Low 7.350
Vol 42097 Avg Vol 427333
Eps -0.120 P/e
Currency: USD
Sign up via our free email subscription service to receive notifications when new information is available.
captcha